Your Assessment Is Scheduled. Can You Show What Changed Since the Last Review?
What Changes When Your Evidence System Runs Continuously
Start collecting early. Pull from SharePoint, email, and whoever remembers where the screenshots are.
Evidence maintained continuously. Generate the assessment package from governed proof instead of rebuilding it each cycle.
Spreadsheet with 110 rows. No link between the requirement and the proof. Assessor has to take your word for it.
Every practice mapped to controls with linked evidence. Gaps are visible before the assessor arrives.
Screenshots of dashboards. Taken once. Already stale by assessment day.
Live telemetry-backed evidence with coverage history, drift detection, and integrity verification.
Different prime, different packet. Rebuild from scratch every subcontract.
Same evidence base, scoped views per prime. Package for each review without duplicating work.
Assessor findings in a PDF. No owner. No tracking. Findings from last cycle still unresolved.
Every finding becomes a tracked remediation item with owner, due date, and closure proof.

Defense Evidence Workspace
Three Steps. From Spreadsheets to Assessment-Ready.
What Your Assessor Sees When You Open Access
Mapped, Not Dumped
Full Access Trail
Evidence Stays Current
